Triple

T25062619
Position Surface form Disambiguated ID Type / Status
Subject BART Antioch extension corridor E627702 entity
Predicate instanceOf P0 FINISHED
Object transit infrastructure corridor C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transit infrastructure corridor
Context triple: [BART Antioch extension corridor, instanceOf, transit infrastructure corridor]
  • A. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • B. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • C. underground rail corridor
    An underground rail corridor is a subsurface passageway engineered to safely guide trains between stations, housing tracks, utilities, and supporting infrastructure while minimizing surface disruption.
  • D. suburban railway corridor
    A suburban railway corridor is a dedicated rail route connecting city centers with surrounding residential suburbs, designed to support frequent, high-capacity commuter train services.
  • E. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff2c45f48190afa28369f1df6786 completed April 18, 2026, 3:49 a.m.
Created at: April 18, 2026, 6:10 a.m.