Triple

T25040434
Position Surface form Disambiguated ID Type / Status
Subject Murray River lock and weir system E627091 entity
Predicate instanceOf P0 FINISHED
Object hydraulic engineering infrastructure C26460 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydraulic engineering infrastructure
Context triple: [Murray River lock and weir system, instanceOf, hydraulic engineering infrastructure]
  • A. canal infrastructure
    Canal infrastructure encompasses the engineered systems, structures, and facilities—such as channels, locks, dams, embankments, and control mechanisms—designed to manage and support waterborne transport, irrigation, drainage, and water regulation along artificial waterways.
  • B. water infrastructure
    Water infrastructure encompasses the systems, facilities, and networks designed to source, treat, store, distribute, and manage water and wastewater for human, industrial, and environmental needs.
  • C. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • D. era of hydraulic engineering
    The era of hydraulic engineering is a historical period characterized by the systematic design, construction, and management of water control structures and systems to support human activities such as agriculture, urbanization, transportation, and energy production.
  • E. engineered waterway chosen
    An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff2a2c088190be513727ee8bfe78 completed April 18, 2026, 3:48 a.m.
Created at: April 18, 2026, 6:08 a.m.