Triple
T25033659
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MetLife Dome |
E626917
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | stadium with retractable roof |
C259
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: stadium with retractable roof Context triple: [MetLife Dome, instanceOf, stadium with retractable roof]
-
A.
multi-purpose stadium
chosen
A multi-purpose stadium is a large, versatile venue designed to host a variety of events, such as sports games, concerts, and community gatherings, by accommodating different configurations and audiences.
-
B.
modernist stadium
A modernist stadium is a large-scale sports and events venue characterized by minimalist forms, exposed structural elements, and functional design that emphasizes openness, light, and the honest expression of materials.
-
C.
sport venue
A sport venue is a designated facility or location equipped to host organized athletic events, competitions, and related spectator activities.
-
D.
ice stadium
An ice stadium is a large indoor or outdoor arena specifically designed and equipped for ice-based sports, events, and spectator activities.
-
E.
stadium design
Stadium design is the conceptual planning and architectural development of sports and event venues that optimize sightlines, crowd flow, safety, acoustics, and fan experience within structural and environmental constraints.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2ff2a2c088190be513727ee8bfe78 |
completed | April 18, 2026, 3:48 a.m. |
Created at: April 18, 2026, 6:07 a.m.