Triple

T250114
Position Surface form Disambiguated ID Type / Status
Subject Alabama–Florida state line near Pensacola E5123 entity
Predicate roadSignageIndicates P8566 FINISHED
Object state boundary between Alabama and Florida LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: state boundary between Alabama and Florida | Statement: [Alabama–Florida state line near Pensacola, roadSignageIndicates, state boundary between Alabama and Florida]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: roadSignageIndicates
Context triple: [Alabama–Florida state line near Pensacola, roadSignageIndicates, state boundary between Alabama and Florida]
  • A. roadFeature
    Indicates that an entity is a specific physical or functional characteristic associated with a road, such as its structure, markings, or related infrastructure.
  • B. hasHazardSignage
    Indicates that appropriate warning or hazard signs are present to alert people to potential dangers associated with the entity.
  • C. roadJunctionIncludes
    Indicates that a road junction spatially contains or encompasses a specific road segment or related roadway element as part of its structure.
  • D. roadSystem
    Indicates a relationship where multiple roads are organized and connected as part of a larger, integrated transportation network or infrastructure.
  • E. roadType
    Indicates the classification or category of a road based on its functional or physical characteristics.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a257c4bf688190a46ebbf411ab7473 completed Feb. 28, 2026, 2:49 a.m.
NER Named-entity recognition batch_69a25d3728f0819086214ccc2db2305a completed Feb. 28, 2026, 3:12 a.m.
PD Predicate disambiguation batch_69a25b665f8c8190aac6fcbba2a0eebb completed Feb. 28, 2026, 3:05 a.m.
PDg Predicate description generation batch_69a25c036b54819090a101c4cbdbcff7 completed Feb. 28, 2026, 3:07 a.m.
Created at: Feb. 28, 2026, 2:54 a.m.