Triple

T25010649
Position Surface form Disambiguated ID Type / Status
Subject La Città Nuova E625975 entity
Predicate instanceOf P0 FINISHED
Object Futurist project C33169 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Futurist project
Context triple: [La Città Nuova, instanceOf, Futurist project]
  • A. Futurist instrument
    A futurist instrument is an innovative device or tool, often blending advanced technology and unconventional design, created to explore or produce novel sounds, interactions, or experiences that evoke speculative or forward-looking worlds.
  • B. futurist book
    A futurist book is a work of non-fiction or speculative writing that explores possible, probable, or preferable futures by examining emerging trends, technologies, and societal shifts.
  • C. visionary architecture project chosen
    A visionary architecture project is a forward-thinking, often speculative design concept that reimagines the built environment through innovative forms, technologies, and social or ecological paradigms beyond conventional practice.
  • D. fictional scientific project
    A fictional scientific project is an imagined research endeavor, often set in a speculative or alternate reality, that explores hypothetical technologies, discoveries, or experiments to drive narrative, illustrate concepts, or examine ethical and societal implications of science.
  • E. military project
    A military project is a coordinated, goal-driven initiative undertaken by armed forces or defense organizations to develop, test, or deploy capabilities, technologies, or operations that enhance national security and military effectiveness.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff27755881908490178e83701160 completed April 18, 2026, 3:48 a.m.
Created at: April 18, 2026, 6:05 a.m.