Triple

T25002799
Position Surface form Disambiguated ID Type / Status
Subject Cherokee Nuclear Power Plant, South Carolina E625762 entity
Predicate primaryUseAfterCancellation P5014 FINISHED
Object film production facility LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: film production facility | Statement: [Cherokee Nuclear Power Plant, South Carolina, primaryUseAfterCancellation, film production facility]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: primaryUseAfterCancellation
Context triple: [Cherokee Nuclear Power Plant, South Carolina, primaryUseAfterCancellation, film production facility]
  • A. usedToCancel
    Indicates that one entity serves as the means or tool by which another entity is canceled, nullified, or invalidated.
  • B. subsequentUse chosen
    Indicates that one entity is used, applied, or consumed after another entity in time or sequence.
  • C. canceledAfter
    Indicates that one event or action was canceled at a point in time occurring after another specified event or action.
  • D. primaryUseOf
    Indicates that one entity serves as the main or principal function, purpose, or application of another entity.
  • E. primaryUseBeforeClosure
    Indicates the main or predominant way something was used during the period immediately preceding its closure or discontinuation.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff26c50481908bc82e799c9e6587 completed April 18, 2026, 3:48 a.m.
NER Named-entity recognition batch_69f6afebd7ec8190ab696f363d84abf0 completed May 3, 2026, 2:16 a.m.
PD Predicate disambiguation batch_69f6aca204148190850a3dc325bc07b7 completed May 3, 2026, 2:02 a.m.
Created at: April 18, 2026, 6:05 a.m.