Triple
T25002799
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cherokee Nuclear Power Plant, South Carolina |
E625762
|
entity |
| Predicate | primaryUseAfterCancellation |
P5014
|
FINISHED |
| Object | film production facility |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: film production facility | Statement: [Cherokee Nuclear Power Plant, South Carolina, primaryUseAfterCancellation, film production facility]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: primaryUseAfterCancellation Context triple: [Cherokee Nuclear Power Plant, South Carolina, primaryUseAfterCancellation, film production facility]
-
A.
usedToCancel
Indicates that one entity serves as the means or tool by which another entity is canceled, nullified, or invalidated.
-
B.
subsequentUse
chosen
Indicates that one entity is used, applied, or consumed after another entity in time or sequence.
-
C.
canceledAfter
Indicates that one event or action was canceled at a point in time occurring after another specified event or action.
-
D.
primaryUseOf
Indicates that one entity serves as the main or principal function, purpose, or application of another entity.
-
E.
primaryUseBeforeClosure
Indicates the main or predominant way something was used during the period immediately preceding its closure or discontinuation.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2ff26c50481908bc82e799c9e6587 |
completed | April 18, 2026, 3:48 a.m. |
| NER | Named-entity recognition | batch_69f6afebd7ec8190ab696f363d84abf0 |
completed | May 3, 2026, 2:16 a.m. |
| PD | Predicate disambiguation | batch_69f6aca204148190850a3dc325bc07b7 |
completed | May 3, 2026, 2:02 a.m. |
Created at: April 18, 2026, 6:05 a.m.