Triple

T25002788
Position Surface form Disambiguated ID Type / Status
Subject Cherokee Nuclear Power Plant, South Carolina E625762 entity
Predicate instanceOf P0 FINISHED
Object unfinished nuclear power plant C41079 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: unfinished nuclear power plant
Context triple: [Cherokee Nuclear Power Plant, South Carolina, instanceOf, unfinished nuclear power plant]
  • A. nuclear weapons assembly plant
    A nuclear weapons assembly plant is a highly secure industrial facility where nuclear and non-nuclear components are manufactured, integrated, and tested to produce complete nuclear weapons in compliance with strict safety, security, and regulatory standards.
  • B. decommissioned nuclear reactor
    A decommissioned nuclear reactor is a permanently shut-down nuclear facility that has been defueled, dismantled or secured, and placed under long-term monitoring and waste management to ensure ongoing safety and environmental protection.
  • C. nuclear power facility
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • D. unfinished building project chosen
    An unfinished building project is a partially constructed structure where work has been halted before completion, leaving it unusable for its intended purpose.
  • E. uranium processing facility
    A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff26c50481908bc82e799c9e6587 completed April 18, 2026, 3:48 a.m.
Created at: April 18, 2026, 6:05 a.m.