Triple

T24955530
Position Surface form Disambiguated ID Type / Status
Subject Support and sustain III Marine Expeditionary Force E624460 entity
Predicate instanceOf P0 FINISHED
Object logistics mission C30085 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: logistics mission
Context triple: [Support and sustain III Marine Expeditionary Force, instanceOf, logistics mission]
  • A. logistical operation
    A logistical operation is a coordinated set of activities and processes that plan, implement, and control the efficient movement and storage of goods, information, or resources from origin to destination.
  • B. logistics command
    Logistics command is the organizational function responsible for planning, coordinating, and controlling the movement, supply, and maintenance of resources to ensure operational readiness and sustained support.
  • C. logistics module
    A logistics module is a software component that manages the planning, execution, and tracking of the movement and storage of goods, information, and related resources across a supply chain.
  • D. logistics brigade chosen
    A logistics brigade is a military unit responsible for planning, coordinating, and executing the supply, transportation, maintenance, and support services needed to sustain combat and support forces.
  • E. military logistics problem
    A military logistics problem involves planning, coordinating, and optimizing the movement, supply, and maintenance of forces and equipment to ensure operational readiness and effectiveness under resource, time, and environmental constraints.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff23a3a88190b1b9743fe5e15f94 completed April 18, 2026, 3:48 a.m.
Created at: April 18, 2026, 5:57 a.m.