Triple

T24954684
Position Surface form Disambiguated ID Type / Status
Subject Oley Valley Feed Mill E624438 entity
Predicate instanceOf P0 FINISHED
Object agricultural facility C46069 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: agricultural facility
Context triple: [Oley Valley Feed Mill, instanceOf, agricultural facility]
  • A. agricultural infrastructure chosen
    Agricultural infrastructure comprises the physical and organizational systems—such as irrigation networks, storage facilities, transportation, and processing plants—that support the efficient production, handling, and distribution of agricultural goods.
  • B. agricultural site
    An agricultural site is a designated area of land used for cultivating crops, raising livestock, or conducting other farming-related activities and operations.
  • C. agricultural attraction
    An agricultural attraction is a farm-based destination that invites visitors to experience, learn about, and enjoy agricultural activities, products, and rural life.
  • D. agricultural center
    An agricultural center is a facility or organization that supports farming and rural development through research, education, resource distribution, and coordination of agricultural activities.
  • E. farm
    A farm is a tract of land and its associated buildings, equipment, and living organisms used for the cultivation of crops and/or the raising of animals for food, fiber, or other agricultural products.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff23a3a88190b1b9743fe5e15f94 completed April 18, 2026, 3:48 a.m.
Created at: April 18, 2026, 5:57 a.m.