Triple
T24948769
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shawfair new town |
E624266
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned new town |
C46587
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned new town Context triple: [Shawfair new town, instanceOf, planned new town]
-
A.
planned city
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
B.
planned garden city
A planned garden city is a deliberately designed urban settlement that integrates residential, commercial, and green spaces in a balanced layout to promote healthy living, social cohesion, and environmental sustainability.
-
C.
planned residential community
A planned residential community is a deliberately designed neighborhood or development where housing, infrastructure, amenities, and land use are pre-organized to create a cohesive living environment.
-
D.
development town
chosen
A development town is a planned urban settlement established to promote regional growth, absorb population, and stimulate economic and social development through targeted infrastructure and housing projects.
-
E.
town plan
A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2ff22e4c48190a0444b5a044f14e8 |
completed | April 18, 2026, 3:48 a.m. |
Created at: April 18, 2026, 5:55 a.m.