Triple

T24948769
Position Surface form Disambiguated ID Type / Status
Subject Shawfair new town E624266 entity
Predicate instanceOf P0 FINISHED
Object planned new town C46587 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned new town
Context triple: [Shawfair new town, instanceOf, planned new town]
  • A. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. planned garden city
    A planned garden city is a deliberately designed urban settlement that integrates residential, commercial, and green spaces in a balanced layout to promote healthy living, social cohesion, and environmental sustainability.
  • C. planned residential community
    A planned residential community is a deliberately designed neighborhood or development where housing, infrastructure, amenities, and land use are pre-organized to create a cohesive living environment.
  • D. development town chosen
    A development town is a planned urban settlement established to promote regional growth, absorb population, and stimulate economic and social development through targeted infrastructure and housing projects.
  • E. town plan
    A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff22e4c48190a0444b5a044f14e8 completed April 18, 2026, 3:48 a.m.
Created at: April 18, 2026, 5:55 a.m.