Triple
T249328
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NASA Space Shuttle program |
E5108
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | space transportation system |
C1126
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: space transportation system Context triple: [NASA Space Shuttle program, instanceOf, space transportation system]
-
A.
space communication project
A space communication project is an organized effort to design, develop, and operate systems that enable reliable data and signal exchange between spacecraft, satellites, and ground stations.
-
B.
NASA mission component
A NASA mission component is a distinct hardware, software, or operational element designed to perform a specific function that contributes to the overall objectives and success of a NASA space mission.
-
C.
memorial space
A memorial space is a designated physical or virtual environment created to honor, remember, and reflect on people, events, or experiences of significant emotional or historical importance.
-
D.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
E.
streetcar system
A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a257c4bf688190a46ebbf411ab7473 |
completed | Feb. 28, 2026, 2:49 a.m. |
Created at: Feb. 28, 2026, 2:54 a.m.