Triple
T24929382
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | XPS |
E618943
|
entity |
| Predicate | printingPipeline |
P8374
|
FINISHED |
| Object | Windows XPS print path |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Windows XPS print path | Statement: [XPS, printingPipeline, Windows XPS print path]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: printingPipeline Context triple: [XPS, printingPipeline, Windows XPS print path]
-
A.
printingSupport
Indicates that one entity provides or is compatible with printing capabilities or services for another entity.
-
B.
printingStatus
Indicates the current state or progress of a printing process for an item or document.
-
C.
printingCompleted
Indicates that a printing process or job has finished successfully and is no longer in progress.
-
D.
printingColor
Indicates that one entity uses or displays a specific color in the context of printing or printed output.
-
E.
printingMethod
chosen
Indicates the technique or process used to produce a printed item or image.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2fab9edd88190b86004a78a28bc20 |
completed | April 18, 2026, 3:30 a.m. |
| NER | Named-entity recognition | batch_69f44a417a58819081777e18dda149fd |
completed | May 1, 2026, 6:37 a.m. |
| PD | Predicate disambiguation | batch_69f442b8479c8190a7c8e416ac9e28a0 |
completed | May 1, 2026, 6:05 a.m. |
Created at: April 18, 2026, 5:29 a.m.