Triple
T24924923
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hoogheemraadschap van Rijnland |
E618826
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water board |
C48930
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water board Context triple: [Hoogheemraadschap van Rijnland, instanceOf, water board]
-
A.
Dutch water board
chosen
A Dutch water board is a regional government body responsible for managing water levels, flood protection, water quality, and wastewater treatment within its designated area in the Netherlands.
-
B.
water barrier
A water barrier is a structure, material, or system designed to prevent or control the passage, infiltration, or flow of water between distinct areas or environments.
-
C.
water infrastructure
Water infrastructure encompasses the systems, facilities, and networks designed to source, treat, store, distribute, and manage water and wastewater for human, industrial, and environmental needs.
-
D.
watershed district
A watershed district is a geographically defined area governed by an organization responsible for managing water resources, drainage, and related environmental concerns within a specific river or drainage basin.
-
E.
water supply dam
A water supply dam is a barrier constructed across a watercourse to store and regulate water primarily for human consumption, irrigation, and other municipal or industrial uses.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2fab9edd88190b86004a78a28bc20 |
completed | April 18, 2026, 3:30 a.m. |
Created at: April 18, 2026, 5:29 a.m.