Triple

T24902469
Position Surface form Disambiguated ID Type / Status
Subject Grand Prix tennis circuit E623617 entity
Predicate instanceOf P0 FINISHED
Object men's professional tennis tour C21682 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: men's professional tennis tour
Context triple: [Grand Prix tennis circuit, instanceOf, men's professional tennis tour]
  • A. men's professional tennis circuit chosen
    The men's professional tennis circuit is the global, year-round series of sanctioned tournaments in which male tennis players compete for rankings, prize money, and titles under governing bodies such as the ATP and ITF.
  • B. ATP Tour Masters 1000 tournament
    An ATP Tour Masters 1000 tournament is a top-tier professional men's tennis event, just below the Grand Slams in prestige, that awards 1000 ranking points to the singles champion and features the world's highest-ranked players competing across nine key tournaments each season.
  • C. Grand Slam men’s singles event
    A Grand Slam men’s singles event is a premier tennis tournament draw in one of the four major championships where male professional players compete individually in a knockout format for ranking points, prize money, and a major title.
  • D. men's golf tour
    A men's golf tour is an organized series of professional golf tournaments for male players, typically run over a season with a structured schedule, ranking system, and prize money.
  • E. former world No. 1 tennis player
    A former world No. 1 tennis player is an athlete who has previously held the top position in the official global singles or doubles rankings of professional tennis.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fac797cc8190b30d77f4121099ac completed April 18, 2026, 3:30 a.m.
Created at: April 18, 2026, 5:27 a.m.