Triple
T24898867
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | PAF Base Nur Khan |
E623518
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Pakistan Air Force base |
C49246
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Pakistan Air Force base Context triple: [PAF Base Nur Khan, instanceOf, Pakistan Air Force base]
-
A.
Indian Air Force station
An Indian Air Force station is a permanent military airbase facility operated by the Indian Air Force that supports aircraft operations, training, logistics, and administrative functions for air defense and related missions.
-
B.
Iraqi Air Force base
An Iraqi Air Force base is a military airfield in Iraq that supports air operations through facilities for aircraft deployment, maintenance, training, logistics, and command and control.
-
C.
Bangladesh Air Force base
A Bangladesh Air Force base is a military installation that supports the operation, maintenance, training, and command activities of Bangladesh’s air combat and support units.
-
D.
Qatar Emiri Air Force base
A Qatar Emiri Air Force base is a military installation that supports the operations, training, maintenance, and deployment of Qatar’s air force aircraft and personnel.
-
E.
Bangladesh Air Force installation
A Bangladesh Air Force installation is a designated military facility or base used by the Bangladesh Air Force for operations, training, logistics, administration, and support of air defense and aviation activities.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2fac797cc8190b30d77f4121099ac |
completed | April 18, 2026, 3:30 a.m. |
Created at: April 18, 2026, 5:26 a.m.