Triple

T24862186
Position Surface form Disambiguated ID Type / Status
Subject Jefferson North Assembly Plant E622181 entity
Predicate instanceOf P0 FINISHED
Object Jeep factory C4810 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Jeep factory
Context triple: [Jefferson North Assembly Plant, instanceOf, Jeep factory]
  • A. Jeep CJ model
    A Jeep CJ model is a compact, open-bodied, four-wheel-drive utility vehicle designed for off-road capability and rugged versatility, derived from the original military Jeep.
  • B. automobile factory
    An automobile factory is a large-scale industrial facility where raw materials and components are systematically assembled, tested, and finished into complete motor vehicles using coordinated machinery, labor, and production processes.
  • C. automotive factory chosen
    An automotive factory is a large-scale industrial facility where vehicles and their components are systematically designed, manufactured, assembled, and tested using specialized machinery, robotics, and human labor.
  • D. Chrysler division
    A Chrysler division is a major organizational unit within the Chrysler automotive company responsible for specific product lines, branding, and market segments.
  • E. General Motors factory
    A General Motors factory is a large-scale automotive manufacturing facility where GM designs, assembles, and tests vehicles and related components using industrial machinery, robotics, and human labor.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fac350d08190b3affde1b451a8c5 completed April 18, 2026, 3:30 a.m.
Created at: April 18, 2026, 5:22 a.m.