Triple
T2485628
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Metrobus Line 4 |
E55918
|
entity |
| Predicate | connectsWith |
P37
|
FINISHED |
| Object |
Mexico City Metro Line 4
Mexico City Metro Line 4 is one of the lines of the Mexico City Metro system, known for its elevated tracks and for serving areas north of the city center.
|
E282395
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mexico City Metro Line 4 | Statement: [Metrobus Line 4, connectsWith, Mexico City Metro Line 4]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Mexico City Metro Line 4 Context triple: [Metrobus Line 4, connectsWith, Mexico City Metro Line 4]
-
A.
Mexico City Metro Line 5
Mexico City Metro Line 5 is a rapid transit line in Mexico City’s metro system that serves the northern part of the city, connecting several key residential and industrial areas.
-
B.
Mexico City Metro Line 3
Mexico City Metro Line 3 is a major north–south rapid transit line in Mexico City’s metro system, connecting key residential and commercial areas across the city.
-
C.
Mexico City Metro Line 7
Mexico City Metro Line 7 is a major rapid transit line running through the western and southwestern parts of Mexico City, connecting key residential, commercial, and governmental areas.
-
D.
Mexico City Metro Line 6
Mexico City Metro Line 6 is a rapid transit line in Mexico City’s metro system that runs east–west across the city’s northern area, connecting multiple residential and industrial zones.
-
E.
Mexico City Metro Line 9
Mexico City Metro Line 9 is an east–west rapid transit line in the Mexico City Metro system that serves key neighborhoods in the southern and central parts of the city.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Mexico City Metro Line 4 Triple: [Metrobus Line 4, connectsWith, Mexico City Metro Line 4]
Generated description
Mexico City Metro Line 4 is one of the lines of the Mexico City Metro system, known for its elevated tracks and for serving areas north of the city center.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Mexico City Metro Line 4 Target entity description: Mexico City Metro Line 4 is one of the lines of the Mexico City Metro system, known for its elevated tracks and for serving areas north of the city center.
-
A.
Mexico City Metro Line 5
Mexico City Metro Line 5 is a rapid transit line in Mexico City’s metro system that serves the northern part of the city, connecting several key residential and industrial areas.
-
B.
Mexico City Metro Line 3
Mexico City Metro Line 3 is a major north–south rapid transit line in Mexico City’s metro system, connecting key residential and commercial areas across the city.
-
C.
Mexico City Metro Line 7
Mexico City Metro Line 7 is a major rapid transit line running through the western and southwestern parts of Mexico City, connecting key residential, commercial, and governmental areas.
-
D.
Mexico City Metro Line 6
Mexico City Metro Line 6 is a rapid transit line in Mexico City’s metro system that runs east–west across the city’s northern area, connecting multiple residential and industrial zones.
-
E.
Mexico City Metro Line 9
Mexico City Metro Line 9 is an east–west rapid transit line in the Mexico City Metro system that serves key neighborhoods in the southern and central parts of the city.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab49e670a88190b928e08302381710 |
completed | March 6, 2026, 9:40 p.m. |
| NER | Named-entity recognition | batch_69abd17705488190b90b1aa66dd25972 |
completed | March 7, 2026, 7:19 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69af8383c0988190885a865c3150c64d |
completed | March 10, 2026, 2:35 a.m. |
| NEDg | Description generation | batch_69af8684439c8190bf0b1772618e0b6d |
completed | March 10, 2026, 2:48 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69af86e12a0c8190b19885bbf9a7d257 |
completed | March 10, 2026, 2:50 a.m. |
Created at: March 6, 2026, 9:45 p.m.