Triple
T24849894
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kegums HPP-1 |
E621856
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hydroelectric power plant unit |
C12222
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hydroelectric power plant unit Context triple: [Kegums HPP-1, instanceOf, hydroelectric power plant unit]
-
A.
hydroelectric power complex
A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
-
B.
run-of-the-river hydroelectric power plant
chosen
A run-of-the-river hydroelectric power plant is a facility that generates electricity by using the natural flow and elevation drop of a river with minimal water storage, diverting part of the river through turbines before returning it downstream.
-
C.
planned hydroelectric power station
A planned hydroelectric power station is a proposed facility designed to generate electricity by harnessing the potential and kinetic energy of water, currently in the stages of planning, approval, or early development rather than operation.
-
D.
hydroelectric dam
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
-
E.
hydro-wind power plant
A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2fac297e481909d3aedc75f585e42 |
completed | April 18, 2026, 3:30 a.m. |
Created at: April 18, 2026, 5:20 a.m.