Triple

T24849894
Position Surface form Disambiguated ID Type / Status
Subject Kegums HPP-1 E621856 entity
Predicate instanceOf P0 FINISHED
Object hydroelectric power plant unit C12222 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydroelectric power plant unit
Context triple: [Kegums HPP-1, instanceOf, hydroelectric power plant unit]
  • A. hydroelectric power complex
    A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
  • B. run-of-the-river hydroelectric power plant chosen
    A run-of-the-river hydroelectric power plant is a facility that generates electricity by using the natural flow and elevation drop of a river with minimal water storage, diverting part of the river through turbines before returning it downstream.
  • C. planned hydroelectric power station
    A planned hydroelectric power station is a proposed facility designed to generate electricity by harnessing the potential and kinetic energy of water, currently in the stages of planning, approval, or early development rather than operation.
  • D. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • E. hydro-wind power plant
    A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fac297e481909d3aedc75f585e42 completed April 18, 2026, 3:30 a.m.
Created at: April 18, 2026, 5:20 a.m.