Triple

T24845742
Position Surface form Disambiguated ID Type / Status
Subject Park Avenue Tunnel E621741 entity
Predicate instanceOf P0 FINISHED
Object former railway tunnel C25042 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: former railway tunnel
Context triple: [Park Avenue Tunnel, instanceOf, former railway tunnel]
  • A. rail tunnel
    A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
  • B. former railway facility chosen
    A former railway facility is a decommissioned or repurposed site that once served operational functions for rail transport, such as stations, depots, yards, or maintenance buildings.
  • C. transportation tunnel
    A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
  • D. former railway station
    A former railway station is a decommissioned train facility that once served passengers or freight but is no longer in active railway use.
  • E. former railway bridge
    A former railway bridge is a decommissioned rail-carrying structure that once supported train traffic but is now unused, repurposed, or preserved for other functions such as pedestrian or cycle paths.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fac297e481909d3aedc75f585e42 completed April 18, 2026, 3:30 a.m.
Created at: April 18, 2026, 5:19 a.m.