Triple

T24831356
Position Surface form Disambiguated ID Type / Status
Subject HMAS Sydney (DDG 42) E621347 entity
Predicate constructionState P157751 FINISHED
Object South Australia NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Australia | Statement: [HMAS Sydney (DDG 42), constructionState, South Australia]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionState
Context triple: [HMAS Sydney (DDG 42), constructionState, South Australia]
  • A. constructionPhase
    Indicates the specific stage or period an entity is in within an overall construction or building process.
  • B. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • C. constructionDirection
    Indicates the orientation or path along which a structure is built or assembled.
  • D. constructionExpanded
    Indicates that a construction project or structure has been enlarged or extended beyond its original size or scope.
  • E. constructionQuality
    Indicates the degree or standard of workmanship and materials used in creating or assembling something.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fac0c3b881909110e5a56c6fa46f completed April 18, 2026, 3:30 a.m.
NER Named-entity recognition batch_69f44a417a58819081777e18dda149fd completed May 1, 2026, 6:37 a.m.
PD Predicate disambiguation batch_69f442b8479c8190a7c8e416ac9e28a0 completed May 1, 2026, 6:05 a.m.
PDg Predicate description generation batch_69f44a3adb7c8190941572f718b3b93c completed May 1, 2026, 6:37 a.m.
Created at: April 18, 2026, 5:15 a.m.