Triple

T24825903
Position Surface form Disambiguated ID Type / Status
Subject Luftwaffe (planned) E621188 entity
Predicate reasonNotRealized P75534 FINISHED
Object rapidly deteriorating military situation LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: rapidly deteriorating military situation | Statement: [Luftwaffe (planned), reasonNotRealized, rapidly deteriorating military situation]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: reasonNotRealized
Context triple: [Luftwaffe (planned), reasonNotRealized, rapidly deteriorating military situation]
  • A. reasonForNotCompletion
    Indicates the explanation or cause for why a task, process, or obligation was not completed.
  • B. reasonNotInForce
    Indicates that a rule, law, or agreement is not currently valid or applicable due to a specified reason.
  • C. reasonForMissingFeature
    Indicates the explanation or cause for why a particular feature is absent or not implemented.
  • D. reasonForNoProduction
    Indicates the specific cause or explanation for why production did not occur.
  • E. reasonForNonCommencement chosen
    Indicates the explanation or cause for why an expected activity, process, or obligation did not begin.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fac0c3b881909110e5a56c6fa46f completed April 18, 2026, 3:30 a.m.
NER Named-entity recognition batch_69f55e519978819087a1676564a74630 completed May 2, 2026, 2:15 a.m.
PD Predicate disambiguation batch_69f4a0edd10c81908a052ab864d57c54 completed May 1, 2026, 12:47 p.m.
Created at: April 18, 2026, 5:05 a.m.