Triple
T24822388
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jacobi theta functions |
E621095
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | modular objects |
C49597
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: modular objects Context triple: [Jacobi theta functions, instanceOf, modular objects]
-
A.
industrial design object
An industrial design object is a mass-produced, functional product whose form, materials, and user interaction are intentionally shaped to optimize usability, aesthetics, and manufacturability.
-
B.
modular load-carrying system
A modular load-carrying system is a configurable assembly of interchangeable components designed to transport, support, and adapt to varying types and amounts of loads in different operational contexts.
-
C.
models
Models are abstract representations or simulations of real-world systems, processes, or concepts used to understand, predict, or optimize their behavior.
-
D.
modular synthesis strategy
A modular synthesis strategy is a flexible approach to chemical or sound design that builds complex systems from interchangeable, well-defined components or modules, enabling efficient customization, optimization, and scalability.
-
E.
module
A module is a self-contained unit of software that groups related functions, classes, and data to organize code and promote reuse and maintainability.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2fabfd4648190bd0e5c7f4dbb6cab |
completed | April 18, 2026, 3:30 a.m. |
Created at: April 18, 2026, 5:04 a.m.