Triple
T24810254
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | TIBERIEUM |
E620764
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | reconstructed term |
C1877
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: reconstructed term Context triple: [TIBERIEUM, instanceOf, reconstructed term]
-
A.
reconstructed language
chosen
A reconstructed language is a hypothesized earlier form of a language or language family, systematically inferred by linguists from patterns in its descendant or related languages.
-
B.
obsolete term
An obsolete term is a word or expression that has fallen out of common usage and is no longer actively used in contemporary language, though it may still be understood by some speakers.
-
C.
revived language
A revived language is a once-extinct or moribund language that has been intentionally brought back into use as a means of communication by a community.
-
D.
recovered factory
A recovered factory is an abandoned or decommissioned industrial facility that has been restored, repurposed, or revitalized for new productive, cultural, or community uses.
-
E.
reconstructed garden
A reconstructed garden is a deliberately restored or re-created outdoor space that revives the design, plantings, and features of a historical or previously existing garden using contemporary materials and interpretation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2fabf26bc8190b191faac8f67065b |
completed | April 18, 2026, 3:30 a.m. |
Created at: April 18, 2026, 4:50 a.m.