Triple

T24762015
Position Surface form Disambiguated ID Type / Status
Subject Far Rockaway Branch junction E619471 entity
Predicate instanceOf P0 FINISHED
Object Long Island Rail Road infrastructure C16806 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Long Island Rail Road infrastructure
Context triple: [Far Rockaway Branch junction, instanceOf, Long Island Rail Road infrastructure]
  • A. Long Island Rail Road facility chosen
    A Long Island Rail Road facility is any physical site, such as stations, yards, maintenance shops, or administrative buildings, that supports the operation, maintenance, and management of the Long Island Rail Road network.
  • B. Long Island Rail Road project
    A Long Island Rail Road project is a coordinated initiative to plan, construct, upgrade, or maintain LIRR infrastructure, services, or operations to improve rail transportation for its riders and communities.
  • C. Long Island Rail Road line
    A Long Island Rail Road line is a specific passenger rail route within the LIRR network that connects designated terminals and intermediate stations across Long Island and the greater New York City area.
  • D. Long Island Rail Road service area
    The Long Island Rail Road service area encompasses the network of commuter rail lines and stations extending from New York City through Nassau and Suffolk counties on Long Island, providing passenger rail service to communities across this region.
  • E. Long Island Rail Road zone
    A Long Island Rail Road zone is a designated geographic fare area used to determine ticket prices and validity for travel on the LIRR network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fabbea94819092ed41348909622f completed April 18, 2026, 3:30 a.m.
Created at: April 18, 2026, 4:27 a.m.