Triple
T24752065
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oficina para el Reordenamiento del Transporte |
E619169
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | organismo público de transporte |
C220
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: organismo público de transporte Context triple: [Oficina para el Reordenamiento del Transporte, instanceOf, organismo público de transporte]
-
A.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
B.
public transportation agency
chosen
A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
-
C.
mass transit operator
A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
-
D.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
E.
transportation organization
A transportation organization is an entity that plans, manages, and operates systems or services that move people or goods from one location to another.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2fabb349881908a13a212a0221a63 |
completed | April 18, 2026, 3:30 a.m. |
Created at: April 18, 2026, 4:25 a.m.