Triple

T24744194
Position Surface form Disambiguated ID Type / Status
Subject Planos em superfície modulada E618649 entity
Predicate instanceOf P0 FINISHED
Object geometric-abstract artwork C477 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: geometric-abstract artwork
Context triple: [Planos em superfície modulada, instanceOf, geometric-abstract artwork]
  • A. Constructivist artwork
    A constructivist artwork is a geometric, often abstract piece that emphasizes industrial materials, functional structure, and the integration of art with modern technology and social purpose.
  • B. conceptual art piece
    A conceptual art piece is an artwork in which the primary focus is on the idea or concept being expressed, rather than on traditional aesthetic, material, or technical concerns.
  • C. Suprematist artwork
    A Suprematist artwork is an abstract composition that uses basic geometric forms and limited colors to express pure artistic feeling independent of representational objects.
  • D. neo-concrete artwork
    A neo-concrete artwork is an abstract, often geometric piece that emphasizes sensory experience, viewer participation, and organic expression over strict rationalism and rigid formalism.
  • E. work of art chosen
    A work of art is a deliberately created object, performance, or experience intended to express ideas or emotions and to be perceived and interpreted aesthetically.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fab8f95c81908bb9e552cf3280c2 completed April 18, 2026, 3:30 a.m.
Created at: April 18, 2026, 4:20 a.m.