Triple

T24743347
Position Surface form Disambiguated ID Type / Status
Subject Николай Ипатьев E618625 entity
Predicate instanceOf P0 FINISHED
Object российский военный инженер C34377 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: российский военный инженер
Context triple: [Николай Ипатьев, instanceOf, российский военный инженер]
  • A. Russian field marshal
    A Russian field marshal is the highest-ranking military officer in the Russian (historically Imperial or Soviet-equivalent) army, responsible for commanding large-scale operations and shaping overall military strategy.
  • B. army engineer chosen
    An army engineer is a military specialist who designs, constructs, and maintains infrastructure and systems to support combat operations and logistical needs in diverse and often hostile environments.
  • C. Russian military personnel
    Russian military personnel are individuals who serve in the armed forces of the Russian Federation, including its army, navy, aerospace forces, and other military branches, performing roles related to national defense, security, and military operations.
  • D. Ukrainian general
    A Ukrainian general is a high-ranking military officer in Ukraine’s Armed Forces responsible for strategic planning, command of large military formations, and oversight of national defense operations.
  • E. Imperial Russian Army general
    An Imperial Russian Army general is a high-ranking military officer of the Russian Empire responsible for commanding large formations, planning and directing operations, and implementing imperial military policy.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fab8f95c81908bb9e552cf3280c2 completed April 18, 2026, 3:30 a.m.
Created at: April 18, 2026, 4:19 a.m.