Triple

T24734619
Position Surface form Disambiguated ID Type / Status
Subject 1994 Major League Baseball season E618376 entity
Predicate plannedWildCardReasonNotImplemented P118384 FINISHED
Object season ended by strike LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: season ended by strike | Statement: [1994 Major League Baseball season, plannedWildCardReasonNotImplemented, season ended by strike]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedWildCardReasonNotImplemented
Context triple: [1994 Major League Baseball season, plannedWildCardReasonNotImplemented, season ended by strike]
  • A. plannedWildCardImplemented
    Indicates that a previously planned wildcard feature, option, or behavior has been successfully implemented or put into effect.
  • B. plannedUnder
    Indicates that one entity has been scheduled, organized, or arranged to occur within the scope, authority, or framework of another entity.
  • C. notImplementedBecause chosen
    Indicates that something has not been implemented and specifies the reason for its lack of implementation.
  • D. plannedVia
    Indicates that something is arranged, organized, or scheduled by means of a particular method, process, or intermediary.
  • E. plannedIn
    Indicates that an event, activity, or process is scheduled or arranged to occur within a specific context, timeframe, or plan.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fab772608190b74163751047ff50 completed April 18, 2026, 3:29 a.m.
NER Named-entity recognition batch_69f422aee0408190899efe7e24ef2b40 completed May 1, 2026, 3:49 a.m.
PD Predicate disambiguation batch_69f420e92cc88190a803aecdae78a051 completed May 1, 2026, 3:41 a.m.
Created at: April 18, 2026, 4:03 a.m.