Triple
T24713797
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hwange Colliery mining operations |
E612104
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | coal mining operation |
C12257
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: coal mining operation Context triple: [Hwange Colliery mining operations, instanceOf, coal mining operation]
-
A.
coal mine
chosen
A coal mine is an industrial site where coal is extracted from underground or surface deposits for use as fuel and raw material.
-
B.
surface mining operation
A surface mining operation is an industrial activity that extracts minerals or other geological materials from the Earth by removing soil and rock layers above the deposit, typically using large-scale earthmoving and processing equipment.
-
C.
coal mine remains
Coal mine remains are the physical traces and structures left behind after coal extraction has ceased, such as shafts, tunnels, spoil heaps, machinery foundations, and associated buildings.
-
D.
coal mining company
A coal mining company is an organization that explores for, extracts, processes, and sells coal resources, typically operating mines and related infrastructure while managing economic, environmental, and regulatory responsibilities.
-
E.
coal mining division
A coal mining division is an organizational unit within a company responsible for the exploration, extraction, processing, and initial distribution of coal resources.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2c4d9c24c8190a3712d74327f0c6e |
completed | April 17, 2026, 11:40 p.m. |
Created at: April 18, 2026, 3:25 a.m.