Triple

T24712375
Position Surface form Disambiguated ID Type / Status
Subject Amílcar Cabral E612064 entity
Predicate instanceOf P0 FINISHED
Object agrarian engineer C1647 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: agrarian engineer
Context triple: [Amílcar Cabral, instanceOf, agrarian engineer]
  • A. agricultural engineering faculty
    An agricultural engineering faculty is a group of academic staff specializing in the application of engineering principles to agricultural production, resource management, and related technologies within a higher education institution.
  • B. agricultural engineering department
    An agricultural engineering department is an academic and research unit that applies engineering principles to improve agricultural production, processing, and resource management systems.
  • C. agricultural expert chosen
    An agricultural expert is a professional who applies scientific knowledge and practical experience to optimize crop and livestock production, manage natural resources sustainably, and advise stakeholders on best farming practices.
  • D. agricultural infrastructure
    Agricultural infrastructure comprises the physical and organizational systems—such as irrigation networks, storage facilities, transportation, and processing plants—that support the efficient production, handling, and distribution of agricultural goods.
  • E. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d9c24c8190a3712d74327f0c6e completed April 17, 2026, 11:40 p.m.
Created at: April 18, 2026, 3:25 a.m.