Triple

T24697443
Position Surface form Disambiguated ID Type / Status
Subject Vision 2040 economic strategy of Oman E611632 entity
Predicate timeHorizonEndYear P34444 FINISHED
Object 2040 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2040 | Statement: [Vision 2040 economic strategy of Oman, timeHorizonEndYear, 2040]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: timeHorizonEndYear
Context triple: [Vision 2040 economic strategy of Oman, timeHorizonEndYear, 2040]
  • A. timeSettingEndYear chosen
    Indicates the year in which a specified time setting, period, or temporal condition comes to an end.
  • B. endYear
    Indicates the year in which an event, state, or relationship comes to an end.
  • C. timeHorizonCovered
    Indicates the span or duration of time that is encompassed or addressed by something (such as a plan, forecast, or agreement).
  • D. travelEndYear
    Indicates the year in which a travel event or journey concludes.
  • E. showEndYear
    Indicates the year in which a show or series concluded or stopped airing.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d76d148190b58ad612467149a5 completed April 17, 2026, 11:40 p.m.
NER Named-entity recognition batch_69f410fe3b848190ae296a29f742ee30 completed May 1, 2026, 2:33 a.m.
PD Predicate disambiguation batch_69f40ee8ada8819089a7016b50308ff0 completed May 1, 2026, 2:24 a.m.
Created at: April 18, 2026, 3:22 a.m.