Triple

T2468830
Position Surface form Disambiguated ID Type / Status
Subject Virginia State Route 7 E55319 entity
Predicate abbreviation P43 FINISHED
Object SR 7
SR 7 is a major east–west state highway in Virginia that connects the Washington, D.C. metropolitan area with communities in Northern Virginia and the Shenandoah Valley.
E270127 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 7 | Statement: [Virginia State Route 7, abbreviation, SR 7]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 7
Context triple: [Virginia State Route 7, abbreviation, SR 7]
  • A. SR 27
    SR 27 is a state highway in Maine that runs north–south, connecting coastal communities with inland towns and recreational areas.
  • B. SR 15
    SR 15 is a state highway in Maine that runs through the city of Brewer and connects several communities in the region.
  • C. SR 1
    SR 1 is a major north–south state highway in Georgia that largely follows the route of U.S. Route 27 across the state.
  • D. SR 54
    SR 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas around Atlanta.
  • E. SR 18
    SR 18 is a state highway in Georgia that runs east–west across the central part of the state, connecting several small towns and regional routes.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 7
Triple: [Virginia State Route 7, abbreviation, SR 7]
Generated description
SR 7 is a major east–west state highway in Virginia that connects the Washington, D.C. metropolitan area with communities in Northern Virginia and the Shenandoah Valley.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SR 7
Target entity description: SR 7 is a major east–west state highway in Virginia that connects the Washington, D.C. metropolitan area with communities in Northern Virginia and the Shenandoah Valley.
  • A. SR 27
    SR 27 is a state highway in Maine that runs north–south, connecting coastal communities with inland towns and recreational areas.
  • B. SR 15
    SR 15 is a state highway in Maine that runs through the city of Brewer and connects several communities in the region.
  • C. SR 1
    SR 1 is a major north–south state highway in Georgia that largely follows the route of U.S. Route 27 across the state.
  • D. SR 54
    SR 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas around Atlanta.
  • E. SR 18
    SR 18 is a state highway in Georgia that runs east–west across the central part of the state, connecting several small towns and regional routes.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49e3622c8190ad22afa2c4fbb807 completed March 6, 2026, 9:40 p.m.
NER Named-entity recognition batch_69abd134684c8190bc62c0af22d75538 completed March 7, 2026, 7:18 a.m.
NED1 Entity disambiguation (via context triple) batch_69af179f90e881909c09edb961b13a75 completed March 9, 2026, 6:55 p.m.
NEDg Description generation batch_69af195ec8788190ae2f94f7cd86e605 completed March 9, 2026, 7:02 p.m.
NED2 Entity disambiguation (via description) batch_69af1a28591c8190ab4f3dca260766f5 completed March 9, 2026, 7:06 p.m.
Created at: March 6, 2026, 9:44 p.m.