Triple

T24679797
Position Surface form Disambiguated ID Type / Status
Subject BNSF Railway facilities in Pittsburg, California E611095 entity
Predicate instanceOf P0 FINISHED
Object railway facility complex C35874 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway facility complex
Context triple: [BNSF Railway facilities in Pittsburg, California, instanceOf, railway facility complex]
  • A. railroad facility chosen
    A railroad facility is a dedicated site or complex that supports the operation, maintenance, management, or interchange of trains and rail infrastructure.
  • B. former railway facility
    A former railway facility is a decommissioned or repurposed site that once served operational functions for rail transport, such as stations, depots, yards, or maintenance buildings.
  • C. railway engineering complex
    A railway engineering complex is an integrated facility where railway infrastructure, rolling stock, and related systems are designed, constructed, tested, maintained, and managed.
  • D. commuter rail station
    A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
  • E. railway station area
    A railway station area is the surrounding zone of a train station that includes platforms, tracks, access roads, passenger facilities, and adjacent public or commercial spaces supporting rail transport activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d5c2dc8190ac857dea25ec6ce9 completed April 17, 2026, 11:40 p.m.
Created at: April 18, 2026, 3:08 a.m.