Triple
T2467641
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wuhan–Guangzhou High-Speed Railway |
E55289
|
entity |
| Predicate | isSegmentOfCorridor |
P6309
|
FINISHED |
| Object |
Beijing–Hong Kong (Taipei) high-speed rail corridor
The Beijing–Hong Kong (Taipei) high-speed rail corridor is a major north–south trunk line in China’s high-speed rail network, planned to link the capital Beijing with Hong Kong and onward toward Taipei as part of the national “eight vertical and eight horizontal” system.
|
E274487
|
NE FINISHED |
Provenance (6 batches)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69ab49e3622c8190ad22afa2c4fbb807 |
elicitation | completed |
| NER | batch_69abd2bc7b5481908b3664495e99f1a4 |
ner | completed |
| NED1 | batch_69af2b7af0d4819080fda496670bc5d7 |
ned_source_triple | completed |
| NED2 | batch_69af4e8f62f88190859f11c3e1623c89 |
ned_description | completed |
| NEDg | batch_69af4e3c7c5c81909b434bf26a130a23 |
nedg | completed |
| PD | batch_69abd0b3ea308190a6d8499c2a542c50 |
pd | completed |
Created at: March 6, 2026, 9:44 p.m.