Triple

T24669015
Position Surface form Disambiguated ID Type / Status
Subject Eldborg E610771 entity
Predicate openingDateApprox P85309 FINISHED
Object 2011 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2011 | Statement: [Eldborg, openingDateApprox, 2011]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: openingDateApprox
Context triple: [Eldborg, openingDateApprox, 2011]
  • A. openingDateApproximate chosen
    Indicates that the date when something was opened or began is not known exactly and is only an approximate value.
  • B. plannedOpeningDate
    Indicates the date on which something is scheduled or intended to begin operating or become available.
  • C. openedAt
    Indicates that an entity began operating, became accessible, or was first made available at a specific time or date.
  • D. officialOpeningDate
    Indicates the calendar date on which something is formally inaugurated or officially opened for use or operation.
  • E. openingDateLine16
    Indicates the date on which line 16 was officially opened or began operation.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d505cc8190981881df06c0bf52 completed April 17, 2026, 11:40 p.m.
NER Named-entity recognition batch_69f41011d8048190be70329ba0bfb7c7 completed May 1, 2026, 2:29 a.m.
PD Predicate disambiguation batch_69f40ed9d47881909fcfc0d04e8d074a completed May 1, 2026, 2:24 a.m.
Created at: April 18, 2026, 2:41 a.m.