Triple
T2466310
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Canarsie Pier |
E55256
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | recreational pier |
C5954
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: recreational pier Context triple: [Canarsie Pier, instanceOf, recreational pier]
-
A.
waterfront pier complex
chosen
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
B.
recreation area
A recreation area is a designated space, either natural or built, intended for leisure, relaxation, and recreational activities such as sports, picnicking, and social gatherings.
-
C.
seaside amusement park
A seaside amusement park is a recreational venue located along a coast that combines rides, games, food stalls, and entertainment with access to the beach and ocean views.
-
D.
playa
A playa is a flat-bottomed desert basin that periodically fills with water to form a temporary lake, then dries to leave behind fine sediments and evaporite minerals.
-
E.
public beach
A public beach is a coastal area owned and maintained by a government or community, freely accessible to the general public for recreation, relaxation, and shoreline activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab49e3622c8190ad22afa2c4fbb807 |
completed | March 6, 2026, 9:40 p.m. |
Created at: March 6, 2026, 9:44 p.m.