Triple

T24656521
Position Surface form Disambiguated ID Type / Status
Subject Rajaraja I E610406 entity
Predicate templeCommissioned P67282 FINISHED
Object Rajarajeswaram (Brihadeeswarar Temple) NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rajarajeswaram (Brihadeeswarar Temple) | Statement: [Rajaraja I, templeCommissioned, Rajarajeswaram (Brihadeeswarar Temple)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: templeCommissioned
Context triple: [Rajaraja I, templeCommissioned, Rajarajeswaram (Brihadeeswarar Temple)]
  • A. plannedTempleDedicatedBy
    Indicates that a temple, while still in the planning or unbuilt stage, is intended or designated to be dedicated by a specific agent or entity.
  • B. templeDedicatedBy
    Indicates that a temple was formally dedicated, consecrated, or established by a specific person, group, or authority.
  • C. foundedTemple
    Indicates that an entity established or created a temple, typically as its founder.
  • D. templeConstruction chosen
    Indicates the action or process of building, erecting, or establishing a temple or similar sacred structure.
  • E. constructionOfMainTempleCompleted
    Indicates that the primary temple’s construction process has been fully completed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d453248190a020354e93ef6282 completed April 17, 2026, 11:40 p.m.
NER Named-entity recognition batch_69f422aee0408190899efe7e24ef2b40 completed May 1, 2026, 3:49 a.m.
PD Predicate disambiguation batch_69f420e92cc88190a803aecdae78a051 completed May 1, 2026, 3:41 a.m.
Created at: April 18, 2026, 2:34 a.m.