Triple

T24650087
Position Surface form Disambiguated ID Type / Status
Subject Messerschmitt KR200 E610225 entity
Predicate instanceOf P0 FINISHED
Object three-wheeler C23932 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: three-wheeler
Context triple: [Messerschmitt KR200, instanceOf, three-wheeler]
  • A. three-wheeled vehicle chosen
    A three-wheeled vehicle is a mode of transportation that travels on three wheels, typically arranged with either one wheel in front and two in back or two in front and one in back, designed to carry one or more passengers or cargo.
  • B. two-wheeled vehicle
    A two-wheeled vehicle is a mode of transportation that balances and moves on two wheels, typically powered by human effort or a motor, and steered by handlebars.
  • C. side-by-side vehicle
    A side-by-side vehicle is a small off-road or utility vehicle with two or more seats positioned next to each other, typically featuring a steering wheel, roll cage, and cargo capacity for recreational or work use.
  • D. micromobility device
    A micromobility device is a small, lightweight, typically single-passenger vehicle—often electric-powered—designed for short-distance urban travel, such as e-scooters, e-bikes, and similar compact transport options.
  • E. motorized unit
    A motorized unit is a self-contained assembly that uses a motor to provide mechanical power or motion for a specific function or system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d350a481909170482bc2ce6af9 completed April 17, 2026, 11:40 p.m.
Created at: April 18, 2026, 2:33 a.m.