Triple

T24636184
Position Surface form Disambiguated ID Type / Status
Subject Delft rail tunnel project E609816 entity
Predicate constructionPhase1Opening P25104 FINISHED
Object 2015 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2015 | Statement: [Delft rail tunnel project, constructionPhase1Opening, 2015]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionPhase1Opening
Context triple: [Delft rail tunnel project, constructionPhase1Opening, 2015]
  • A. constructionPhase
    Indicates the specific stage or period an entity is in within an overall construction or building process.
  • B. phasedOpening
    Indicates that the opening or launch of something occurs in multiple planned stages or phases rather than all at once.
  • C. mainConstructionPhaseUnder
    Indicates that one construction phase occurs under or is subordinate to another primary construction phase in a project’s timeline or hierarchy.
  • D. startConstruction
    Indicates that an entity initiates the process of building or constructing another entity or structure.
  • E. initialOpening chosen
    Indicates the first or earliest instance in which something is opened, begun, or made accessible.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d28f848190ac38c400060e943d completed April 17, 2026, 11:40 p.m.
NER Named-entity recognition batch_69f2be064ff88190b5d9e5ec75a41242 completed April 30, 2026, 2:27 a.m.
PD Predicate disambiguation batch_69f2a6d0ab708190b2e3b94dd20ca76b completed April 30, 2026, 12:48 a.m.
Created at: April 18, 2026, 2:33 a.m.