Triple

T24621641
Position Surface form Disambiguated ID Type / Status
Subject Siljan hydroelectric installations E609427 entity
Predicate instanceOf P0 FINISHED
Object hydroelectric power station complex C8017 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d1d3708190a0f2dc6a3a8523bb completed April 17, 2026, 11:40 p.m.
Created at: April 18, 2026, 2:32 a.m.