Triple

T24608705
Position Surface form Disambiguated ID Type / Status
Subject Cruz Azul cement plant E609056 entity
Predicate instanceOf P0 FINISHED
Object cement plant C4731 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cement plant
Context triple: [Cruz Azul cement plant, instanceOf, cement plant]
  • A. cement company
    A cement company is a business entity that manufactures and supplies cement and related construction materials for use in building and infrastructure projects.
  • B. industrial plant
    An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
  • C. manufacturing plant chosen
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • D. limestone quarry complex
    A limestone quarry complex is an integrated industrial site where limestone is extracted, processed, and sometimes refined or transported, typically including open pits, crushing facilities, storage areas, and supporting infrastructure.
  • E. alumina refinery
    An alumina refinery is an industrial facility that processes bauxite ore through chemical and physical methods to produce alumina (aluminum oxide), the primary raw material for aluminum production.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d060e08190ac9f7c49b1036e20 completed April 17, 2026, 11:40 p.m.
Created at: April 18, 2026, 2:31 a.m.