Triple

T24604947
Position Surface form Disambiguated ID Type / Status
Subject Unified Planning Work Program E608939 entity
Predicate instanceOf P0 FINISHED
Object metropolitan transportation planning instrument C48500 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: metropolitan transportation planning instrument
Context triple: [Unified Planning Work Program, instanceOf, metropolitan transportation planning instrument]
  • A. regional transport plan
    A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
  • B. short-range transportation plan
    A short-range transportation plan is a detailed, near-term (typically 1–5 years) strategy outlining specific projects, investments, and operational changes to improve a transportation system’s performance and meet immediate mobility needs.
  • C. spatial planning instrument
    A spatial planning instrument is a formal tool, policy, or regulatory mechanism used by authorities to guide, control, and coordinate the use and development of land and space within a defined territory.
  • D. transit-oriented development area
    A transit-oriented development area is a compact, walkable, mixed-use urban district planned around high-quality public transportation to reduce car dependence and support sustainable living.
  • E. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d060e08190ac9f7c49b1036e20 completed April 17, 2026, 11:40 p.m.
Created at: April 18, 2026, 2:31 a.m.