Triple
T24604786
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Realistic Manifesto |
E608935
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | art manifesto |
C13669
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: art manifesto Context triple: [Realistic Manifesto, instanceOf, art manifesto]
-
A.
artistic manifesto
chosen
An artistic manifesto is a declarative text in which artists articulate their creative principles, intentions, and challenges to existing aesthetic or cultural norms.
-
B.
public art movement
A public art movement is a collective, often community-driven effort to create and promote artworks in shared public spaces, aiming to engage broad audiences, reflect social values, and transform the experience of the built environment.
-
C.
artistic concept
An artistic concept is an abstract idea or guiding principle that shapes the meaning, form, and intent of an artwork or creative project.
-
D.
art museum project
An art museum project is a coordinated initiative to design, develop, or enhance a museum space and its programs for collecting, exhibiting, and interpreting works of art for public engagement and education.
-
E.
art exhibition
An art exhibition is a curated public display of artworks organized around a theme, artist, or period, presented in a designated space for viewers to experience and interpret.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2c4d060e08190ac9f7c49b1036e20 |
completed | April 17, 2026, 11:40 p.m. |
Created at: April 18, 2026, 2:31 a.m.