Triple
T24590442
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cable Building |
E608517
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former cable car power station |
C48484
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former cable car power station Context triple: [Cable Building, instanceOf, former cable car power station]
-
A.
cable car station
A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
-
B.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
C.
former railway station
A former railway station is a decommissioned train facility that once served passengers or freight but is no longer in active railway use.
-
D.
coal-fired power station
A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
-
E.
former railway facility
A former railway facility is a decommissioned or repurposed site that once served operational functions for rail transport, such as stations, depots, yards, or maintenance buildings.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2c4cf54248190af7b0c2d9ade9830 |
completed | April 17, 2026, 11:39 p.m. |
Created at: April 18, 2026, 2:30 a.m.