Triple

T24585030
Position Surface form Disambiguated ID Type / Status
Subject North Concourse E608361 entity
Predicate instanceOf P0 FINISHED
Object exhibition and meeting hall complex C3167 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: exhibition and meeting hall complex
Context triple: [North Concourse, instanceOf, exhibition and meeting hall complex]
  • A. convention center chosen
    A convention center is a large, purpose-built facility designed to host conferences, trade shows, exhibitions, and other large-scale events, providing flexible meeting spaces and supporting services.
  • B. exhibition facility
    An exhibition facility is a dedicated space designed to host and display temporary or permanent shows, events, or presentations for public or specialized audiences.
  • C. exhibition pavilion
    An exhibition pavilion is a temporary or permanent standalone structure designed to showcase artworks, products, ideas, or cultural content within exhibitions, fairs, or public events.
  • D. museum building complex
    A museum building complex is a coordinated group of structures and spaces designed to collect, preserve, exhibit, and interpret cultural, historical, artistic, or scientific artifacts for public education and enjoyment.
  • E. conference center
    A conference center is a large, purpose-built facility designed to host meetings, conventions, exhibitions, and other events, providing flexible spaces and supporting services for groups of various sizes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4ce89248190ad99e18f0638dfbb completed April 17, 2026, 11:39 p.m.
Created at: April 18, 2026, 2:29 a.m.