Triple

T2457304
Position Surface form Disambiguated ID Type / Status
Subject Strait of Messina E54451 entity
Predicate bridgeProposalStatus P13063 FINISHED
Object not built as of 2024 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: not built as of 2024 | Statement: [Strait of Messina, bridgeProposalStatus, not built as of 2024]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: bridgeProposalStatus
Context triple: [Strait of Messina, bridgeProposalStatus, not built as of 2024]
  • A. bridgeName
    Indicates the designated name assigned to a specific bridge.
  • B. hasProposedOutcome chosen
    Indicates that an action, decision, or process is associated with a suggested or anticipated result that is being put forward but not yet realized or confirmed.
  • C. bridgeUsed
    Indicates that a bridge is utilized or traversed by an entity to cross between two locations or points.
  • D. bridgeLocation
    Indicates the specific place or area where a bridge is situated or spans.
  • E. proposalProcess
    Indicates the process or sequence of actions involved in creating, submitting, reviewing, and deciding on a proposal between entities.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49dee84c819096b50a0049c347ac completed March 6, 2026, 9:40 p.m.
NER Named-entity recognition batch_69abd49c5aa081909ab4f726a458b77f completed March 7, 2026, 7:32 a.m.
PD Predicate disambiguation batch_69abd0b199488190aa381b36593ae1ac completed March 7, 2026, 7:16 a.m.
Created at: March 6, 2026, 9:44 p.m.