Triple
T24565181
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Beauchamp–Feuillet notation |
E607766
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | early modern dance notation |
C27946
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: early modern dance notation Context triple: [Beauchamp–Feuillet notation, instanceOf, early modern dance notation]
-
A.
dance notation system
chosen
A dance notation system is a structured method for visually recording and communicating the movements, timing, and spatial patterns of dance so that choreography can be accurately preserved and reproduced.
-
B.
Baroque dance
Baroque dance is a highly stylized form of 17th- and early 18th-century court and theatrical dance characterized by intricate step patterns, formalized gestures, and close integration with Baroque music and social etiquette.
-
C.
Byzantine chant notation
Byzantine chant notation is a medieval and later musical notation system used in the Eastern Orthodox Church to record and transmit the melodic formulas and modal structures of Byzantine chant through specialized neumes and symbols.
-
D.
neoclassical ballet
Neoclassical ballet is a style of ballet that blends the strict technique and formality of classical ballet with greater freedom of movement, musicality, and modern, often abstract, themes.
-
E.
classical ballet
Classical ballet is a highly formalized and codified style of dance characterized by precise technique, structured movements, and storytelling through graceful, expressive choreography.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2c4cc35a48190990b7571bc086df8 |
completed | April 17, 2026, 11:39 p.m. |
Created at: April 18, 2026, 2:28 a.m.