Triple
T24541556
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | former New Synagogue of Amsterdam |
E607106
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | synagogue building |
C3548
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: synagogue building Context triple: [former New Synagogue of Amsterdam, instanceOf, synagogue building]
-
A.
Reform synagogue
A Reform synagogue is a Jewish house of worship and community that practices Reform Judaism, emphasizing progressive religious interpretation, egalitarianism, and adaptation of Jewish tradition to modern life.
-
B.
Jewish temple
A Jewish temple is a sacred place of worship, communal gathering, and religious practice for Jews, serving as a center for prayer, study, and cultural life.
-
C.
religious building
chosen
A religious building is a structure specifically designed and used for worship, rituals, and other activities associated with a particular faith or spiritual tradition.
-
D.
Orthodox Jewish congregation
An Orthodox Jewish congregation is a community of Jews who gather regularly to pray, study Torah, and observe Jewish law and tradition in accordance with Orthodox halachic standards.
-
E.
בית עלמין יהודי
בית עלמין יהודי הוא מקום קבורה יהודי המיועד לקבורת נפטרים לפי ההלכה והמסורת היהודית, תוך שמירה על קדושת המקום, טקסי הקבורה וסדרי המצבות.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2c4c9bf94819082d05da6f5c29907 |
completed | April 17, 2026, 11:39 p.m. |
Created at: April 18, 2026, 2:26 a.m.