Triple
T24537097
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | United States Coast Guard Aviation Logistics Center |
E606979
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | aviation maintenance facility |
C21860
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: aviation maintenance facility Context triple: [United States Coast Guard Aviation Logistics Center, instanceOf, aviation maintenance facility]
-
A.
aircraft maintenance company
An aircraft maintenance company is an organization that inspects, repairs, overhauls, and services aircraft and their components to ensure safety, reliability, and regulatory compliance.
-
B.
military aviation maintenance organization
chosen
A military aviation maintenance organization is a structured unit responsible for inspecting, repairing, servicing, and ensuring the airworthiness and mission readiness of military aircraft and related systems.
-
C.
aviation infrastructure organization
An aviation infrastructure organization is an entity responsible for planning, developing, operating, and maintaining the physical and technological systems that support air transportation, such as airports, air traffic control, and related facilities.
-
D.
aircraft factory
An aircraft factory is an industrial facility where aircraft and their components are designed, manufactured, assembled, and tested before delivery to customers.
-
E.
aircraft hangar
An aircraft hangar is a large, enclosed structure designed for housing, maintaining, and protecting aircraft from weather and environmental conditions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2c4c90c848190b23c4303620dcaaf |
completed | April 17, 2026, 11:39 p.m. |
Created at: April 18, 2026, 2:26 a.m.