Triple

T24535538
Position Surface form Disambiguated ID Type / Status
Subject New York City (Steven Holl Architects headquarters) E606938 entity
Predicate instanceOf P0 FINISHED
Object architectural firm headquarters C400 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: architectural firm headquarters
Context triple: [New York City (Steven Holl Architects headquarters), instanceOf, architectural firm headquarters]
  • A. architecture and design firm
    A professional company that plans, designs, and often oversees the construction of buildings and interior spaces, integrating aesthetics, functionality, and client needs.
  • B. headquarters chosen
    The headquarters is the primary location where an organization’s central management, strategic decision-making, and key administrative functions are coordinated and controlled.
  • C. former corporate headquarters
    A former corporate headquarters is a building or complex that once served as the primary administrative and executive center for a corporation but no longer fulfills that role.
  • D. Beaux-Arts architectural firm
    A Beaux-Arts architectural firm is a design practice that creates grand, formally composed buildings characterized by classical symmetry, rich ornamentation, and academic planning principles rooted in the École des Beaux-Arts tradition.
  • E. modernist architecture firm
    A modernist architecture firm is a design-focused company that creates functional, minimalist buildings emphasizing clean lines, open spaces, and innovative use of modern materials and technology.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4c90c848190b23c4303620dcaaf completed April 17, 2026, 11:39 p.m.
Created at: April 18, 2026, 2:26 a.m.